Machine Deliveries & Installation GuideIt is recommended to print out this guide and tick off each stage in the process as it is completed.Warranties & Engineering Services: -
-
-
-
-
Warranties on cashless payment systems are provided exclusively by the payment system provider. Machine Deliveries Checklist: -
A Site Survey Form, as/if required, will be sent to you shortly after your order has been received. -
You will be notified of your delivery date shortly after you have returned your completed Site Survey Form to us. -
An engineer will then be 'pencilled in' to attend the installation and user training session on the next available working day after delivery. -
Your machine will be delivered by specialist courier who will place it where indicated on your Site Survey form. -
Please check outer packaging for any indications of damage in transit. -
The delivery crew will unpack your machine and remove all packaging from site unless you ask them to do otherwise. -
Please check unpacked machine for any visual signs of damage. -
Notify Cafexpress Ltd that your machine has been delivered and if any suspected problems. -
Date of engineer attendance will then be confirmed by return. NB: PLEASE DO NOT CONNECT THE MACHINE TO SERVICES BEFORE THE ENGINEER ARRIVES. Pre-installation requirements to be put in place by client:All Machines: -
13 amp electric socket within 1M of machine location. -
Machine and all ingredients/consumables on site. -
Cash float (20-30 of each coin) for change giving coin mechanism, if fitted. Mains Water Connected Machines: -
Mains water supply terminated in ¾” BSP isolator valve within 1M of machine location. -
1” hole required in any obstruction for path of hoses from mains supply to filter and/or water filter location to machine. -
Fresh/liquid milk enabled machines only: 8 litres of milk for calibration purposes. User Training Session Checklist: -
Recommended that a minimum of 2 people are available for training session, all equipped to take notes. -
Please make sure that by the end of the training session your training nominees feel confident how to: -
Correctly fill all product containers. -
Strip the machine down for deep cleaning, including any brewers and/or fridges, and reassemble. -
Identify which parts of the machine need cleaning and how often. -
Run any manually activated cleaning/flushing processes. -
Change selling prices if payment system is fitted. -
Fit replacement water filter cartridges as/when required. That will be either 6 or 12 monthly dependant on filter type to be fitted. -
Clear and reset common error codes. (Engineer will advise according to each machine type.) -
Correctly fill & empty cash float in coin mechanism (if fitted) and how to clear coin jams. -
HOT DRINK MACHINES: Check all selections are calibrated to satisfactory cup level & strength settings. -
Final check of above before signing off install as satisfactorily completed. NB: PLEASE KEEP ALL MANUALS & TRAINING NOTES SAFE FOR FUTURE REFERENCE.Any questions on any of the above? Please do not hesitate to contact us.Revision date: 19/07/23.
|
|